Filming Schedule

We shot our opening sequence on the 9th of March, below is a detailed schedule of what happened on the day:
3:00: We left school after making sure we had all the equipment we needed to ensure we would have everything so that we could film.
3:30: We arrived at our location, and got ready to set up, also put all the props that we needed into place.
3:55: We begun to film the first shot, doing this shot a number of times because it was near a road and a number of people were walking in and out of the frame.
4:30: We were halfway through filming, we had to make sure we filmed a number of the shots so that we got the right shot that we wanted.
4:45: Had just started the last shot, we had to do this one about 10 times because the disruptions. Also the props that we had to use for this shot were not in the right place or didn't go where we thought would be good.
5:15: Finished Filming every shot that we had on our storyboard and began to pack up.
The whole afternoon/evening of filming was very successful although we had to change a couple of shots from what we had on our storyboard because when we got to the location the shot that we wanted to do just didn't look very good through the camera.